Builder: Laing O’ Rouke | Fulton Hogan
Client: Level Crossing Removal Authority
Works completed:
- Structural pads with holding down bolts;
- Strip footings and columns (FRP);
- Pile caps, grounds slabs, suspended slabs, ramps, large stairways;
- In situ concrete walls and retaining walls.
All works were completed during occupation and 24/7 when required
Builder: Laing O’ Rouke | Fulton Hogan
Client: Level Crossing Removal Authority
Works completed:
- Structural pads with holding down bolts;
- Strip footings and columns (FRP);
- Pile caps, grounds slabs, suspended slabs, ramps, large stairways;
- In situ concrete walls and retaining walls.
All works were completed during occupation and 24/7 when required