Builder: Lend Lease / CPB
Client: Level Crossing Removal Authority
Works included:
- 64 pad footings with HD bolts;
- 1400LM of strip footings were poured to a tight tolerance to allow gantry cranes to run up and down;
- 15,000M2 of non slip factory floor with deep thickenings which included laying continuous rails to move precast forms;
- Factory floor was poured in 9 pours using two pumps per pour and twin truck feeds per pump. This was required due to the large volume of concrete needed to complete the pour.
Builder: Lend Lease / CPB
Client: Level Crossing Removal Authority
Works included:
- 64 pad footings with HD bolts;
- 1400LM of strip footings were poured to a tight tolerance to allow gantry cranes to run up and down;
- 15,000M2 of non slip factory floor with deep thickenings which included laying continuous rails to move precast forms;
- Factory floor was poured in 9 pours using two pumps per pour and twin truck feeds per pump. This was required due to the large volume of concrete needed to complete the pour.