CLIENT: CYP DESIGN & CONSTRUCTION JOINT VENTURE
Speedpro completed the base slabs at Franklin East shaft for CYP. Works included the FRP package of over 1,500m2 of base slabs as well as a two level sump area. Installed over 3,000m3 of structural concrete and installed over 1,100 tone of reinforcement. This project was particularly challenging due to being 40 meters below ground.
CLIENT: CYP DESIGN & CONSTRUCTION JOINT VENTURE
Speedpro completed the base slabs at Franklin East shaft for CYP. Works included the FRP package of over 1,500m2 of base slabs as well as a two level sump area. Installed over 3,000m3 of structural concrete and installed over 1,100 tone of reinforcement. This project was particularly challenging due to being 40 meters below ground.