Your Custom Text Here
Builder: Multiplex
Client: Victorian Racing Club
Works Completed:
- Over a hundred meters of insitu tunnel walls formed, reinforced and poured;
- Tunnel lids formed, reinforced and poured with the ground slabs;
- 6,000m2 of concrete slabs;
- 2,500m3 of concrete poured in the slabs in 10 pours with very tight site constraints;
- Over 400 tonne of reinforcement installed in a very difficult layout due to the curved shape of the building.
Builder: Multiplex
Client: Victorian Racing Club
Works Completed:
- Over a hundred meters of insitu tunnel walls formed, reinforced and poured;
- Tunnel lids formed, reinforced and poured with the ground slabs;
- 6,000m2 of concrete slabs;
- 2,500m3 of concrete poured in the slabs in 10 pours with very tight site constraints;
- Over 400 tonne of reinforcement installed in a very difficult layout due to the curved shape of the building.